hai guyz,so today we're going to have a lecture about Industrial automation by :-
Name : Dr Azlan Bin Amran
Senior General Manager ,Administration centre
Lecture : Industrial Automation (japanese work culture)
Date : 6.11.2012\
Timeline : 1990-graduate from University of Electronic Communication(Chofu,Tokyo,Japan)
-Join Canon Opto (Malaysia) Sdn Bhd (Production Engineering department
Content about his lecture :-
1.Canon Opto (malaysia) sdn bhd
Date of incorporation : 14 th Dec 1988
Address : Jalan Selisik ,Seksyen 26,
40400 Shah Alam,Selangor
Land area : 131 600m2
Product : EF lenses,optical lens
2.Product assembly building :-
PowerShot SX160 IS :-
A Walkthrough the production of EF 40mm f/2.8 STM :-
Lens Mount - Canon EF
Filter size - 52mm
Weight - 130g
Height - 22.8mm
3.Manufacturing Company roles in the product life cycle:-
Product design -> Product development -> Product Mass/Trial -> Production Mass/Production
{<--------------factory (EQCD)----------------->
-> Sales and service.
E-Environment
Q-Quality
C-Course
D-Drawing
*In state of EQCD -
Engineers must transform a "prototype" production into a "mass production" product.
(R&D drawing ----------------->Process drawing (Manufacturing specification).
4.Lens Manufacturing :
Spherical Lens ;-
Penta Prism :-
5.Programming language use for Industrial manufacturing process :-
1.FORTH language
2.Basic
3.FIFTH
4.Assembler
5Visual Basic
6.PLC
7.Visual C/C++
6.Japanese work culture
i. HORENSO
-Report(houkoku) ,contact (renraku),consultation (soudan)
houkoku - This is the most important ' soft skill' that you need.
- Always start the report with ' conclusion'
Contact - give the information
Consultation -Always seek consultation by appointment or inform the issue/theme/problem.
ii. SAN-GEN
-Site,Actual Spot (Genba),Actual Thing (Genbutsu) , Reality (Genjitsu)
Name : Dr Azlan Bin Amran
Senior General Manager ,Administration centre
Lecture : Industrial Automation (japanese work culture)
Date : 6.11.2012\
Timeline : 1990-graduate from University of Electronic Communication(Chofu,Tokyo,Japan)
-Join Canon Opto (Malaysia) Sdn Bhd (Production Engineering department
Content about his lecture :-
1.Canon Opto (malaysia) sdn bhd
Date of incorporation : 14 th Dec 1988
Address : Jalan Selisik ,Seksyen 26,
40400 Shah Alam,Selangor
Land area : 131 600m2
Product : EF lenses,optical lens
2.Product assembly building :-
PowerShot SX160 IS :-
A Walkthrough the production of EF 40mm f/2.8 STM :-
Lens Mount - Canon EF
Filter size - 52mm
Weight - 130g
Height - 22.8mm
3.Manufacturing Company roles in the product life cycle:-
Product design -> Product development -> Product Mass/Trial -> Production Mass/Production
{<--------------factory (EQCD)----------------->
-> Sales and service.
E-Environment
Q-Quality
C-Course
D-Drawing
*In state of EQCD -
Engineers must transform a "prototype" production into a "mass production" product.
(R&D drawing ----------------->Process drawing (Manufacturing specification).
4.Lens Manufacturing :
Spherical Lens ;-
Penta Prism :-
5.Programming language use for Industrial manufacturing process :-
1.FORTH language
2.Basic
3.FIFTH
4.Assembler
5Visual Basic
6.PLC
7.Visual C/C++
6.Japanese work culture
i. HORENSO
-Report(houkoku) ,contact (renraku),consultation (soudan)
houkoku - This is the most important ' soft skill' that you need.
- Always start the report with ' conclusion'
Contact - give the information
Consultation -Always seek consultation by appointment or inform the issue/theme/problem.
ii. SAN-GEN
-Site,Actual Spot (Genba),Actual Thing (Genbutsu) , Reality (Genjitsu)
No comments:
Post a Comment